LATEST NEWS

30 April 2008
Designed to study the Earth's oceans and climate, Jason-2 will take over from its predecessor, Jason-1, which has already been in orbit for seven years and is still operational.
28 April 2008
Amos-3 will replace the Amos-1 geostationary communications satellite launched in 1996 allowing Spacecom to expand its Ku-band offering.
24 April 2008
GIOVE-B (Galileo In Orbit Validation Element) will verify the most critical technologies of the European satellite navigation system Galileo.
18 April 2008
Star One C2, the second of the "C-series" telecommunication satellites, designed and built by Thales Alenia Space, is now ready for launch at the Kourou launch site, in French Guiana.
14 April 2008
Thales Alenia Space has signed a contract with the European Space Agency to supply the Sentinel-3 Earth observation satellite for the Global Monitoring for Environment and Security (GMES) program.

PRESENTATIONS

A global reference in space programs

ProfileThales Alenia Space Profile
A Global Reference in Space Programs
PDF document  Download
Space Infrastructure
A Major Contributor to the International Space Station
PDF document  Download
Defense & SecurityDefense & Security
The European Leader in Space-based Security and Defense Systems
PDF document  Download
ObservationObservation
A Full Range of Earth Observation Technologies
PDF document  Download
ScienceSciences
The European Reference in Sciences
PDF document  Download


MEDIALIBRARY

Thales Alenia Space's Royalty-free Pictures & Videos

PRESS CONTACT

Florence Pontieux
Tel. +33 (0)1 57 77 91 26
Fax +33 (0)1 57 77 91 22